Implementation Budgeting

ASW's implementation budgeting software estimates the cost of implementing various energy efficiency measures (EEMs), including cost of the equipment, installation labor, and other associated costs.

Our library includes several different programs targeted toward various implementation situations.

  • The Central Plant Implementation Budget program estimates the implementation budget of a central cooling and heating plant based on the type of chillers (such as centrifugal, screw, absorption, etc.), number and size of the cooling equipment, CHW- and HHW-pipe and fitting requirements, type of boiler, size and length of the boiler-stack, etc.

  • The TES Implementation Budget program estimates the implementation budget of a TES (thermal energy storage) system based on the type of system (such as Eutectic-salts, ice-harvesting, etc.), size and type of the TES tank (such as concrete, steel, etc.), piping and fitting requirements, transfer-pumps requirements, scope of the electric work, etc.

  • The Facility Appraisal Budget program estimates the costs of electrical, mechanical, plumbing, controls, sprinkler systems, fire and life safety systems. This program was developed to meet the "Total Energy Service" project requirements.

  • The Motor Replacement Implementation Budget program estimates the implementation cost of replacing old motors with high-efficiency motors and identifies the annual energy savings associated with the high-efficiency motors.

  • The Sheet Metal Implementation Budget program estimates the implementation cost of installing air distribution systems for a given facility.

  • The Electric System Implementation Budget program estimates the implementation cost of installing an electric system distribution for any given facility.

  • The Lighting Replacement Implementation Budget program estimates the implementation cost of replacing existing lighting with state-of-the-art lighting systems. The user inputs the existing and recommended type of fixtures and the program identifies the implementation cost and annual savings.

PDF icon denotes a link to a PDF file. To view a PDF file, you must have Adobe Acrobat viewer installed on your computer. You can download the reader for free by clicking here.

   
       

updated December 8, 2003

 
Products and Services
Clients
Affiliates and Alliances
Company Profile
The ASW Team
News and Resources
When Do You Need an Engineering Consultant?
Contact
 